Skip to main content
Water

R.C. Harris WTP Zebra Mussel Control System

Toronto, Ontario, Canada
default

Protecting Toronto’s drinking water infrastructure from invasive mussel buildup

Market

Water

Key Services

Construction

Preconstruction

Self-Perform

Strategic Partnerships

Virtual Design & Construction

Delivery Method
Design-Build (DB)

The challenge

The R.C. Harris Water Treatment Plant plays a critical role in the Toronto Water supply network. The plant draws raw water from Lake Ontario, and its existing zebra mussel control infrastructure required replacement to improve raw water pre-chlorination, sampling, and monitoring. The main process constraints were that the existing systems had to be operational, and no interruptions are caused to plant operations. To facilitate plant operations and cause minimum disruption to public access, various construction activities such as Microtunneling, hand mining, jet grouting, and offshore marine works were performed to install the new zebra mussel control and raw water sampling system.

Key Facts

Added real-time Lake Current and Raw Water Quality monitoring


Supports 950 MLD water treatment capacity


Diver and heavy marine equipment support


Challenge met

Alberici’s work supports upgrades to prechlorination, zebra mussel control, raw water sampling, and lake current monitoring systems at the R.C. Harris Water Treatment Plant. The project includes extensive process, structural, electrical, and SCADA improvements designed to improve operational reliability, protect raw water infrastructure, and support environmental stewardship. The scope required coordination around existing plant operations and marine conditions tied to the plant raw water intake system.

Recent Projects

Morro Bay Water Reclamation Facility

AgX Membrane Filtration/Reverse Osmosis (MF/RO) Facility

De Soto Wastewater Treatment Facility Expansion