Skip to main content
Heavy Industrial, Industrial Process

PyraMax Proppant Facility

Wrens, Georgia

Helping a start-up win the race to market

Market

Heavy Industrial

Industrial Process

Key Services

Construction

Preconstruction

Self-Perform

Strategic Partnerships

Delivery Method
Engineer-Procure-Construct
Capacity
118,600 SF

The challenge

Constructing a cutting-edge ceramic proppant production facility posed several challenges. The project demanded innovative engineering to create an efficient process for manufacturing high-quality ceramic beads, essential for hydraulic fracturing in the oil and gas industry. Managing a vast range of equipment and complex systems required careful synchronization, especially given the project’s Engineer-Procure-Construct (EPC) contract and aggressive schedule. Ensuring safety compliance under Mine Safety and Health Administration (MSHA) regulations while coordinating a peak on-site labor force of 450 added another layer of complexity to the endeavor.

Key Facts

500 million pounds-per-year capacity


118,600 SF under-roof production capacity


4,500 tons of structural steel

Challenge met

Alberici coordinated with SSOE/Clark Nexsen to act as a single entity for design, procurement, and construction — streamlining communication and decision-making. Extensive preconstruction services, including environmental permitting and value analysis, helped meet an accelerated schedule. By identifying early bid packages and leveraging design-assist subcontractors, Alberici facilitated a fast-track schedule, while strict adherence to MSHA guidelines maintained safety throughout the project’s 1 million workhours. The result was the successful delivery of a technologically advanced facility capable of producing 500 million pounds of ceramic proppant annually, showcasing Alberici’s proficiency in complex, innovative industrial projects.

Recent Projects

Upstream Approach Walls at the Soo Locks Complex

New Lock at the Soo

Long-Baseline Neutrino Facility Far Site Facilities Excavation