| 1 of 3 |
Client: Louisville Metropolitan Sewerage District
Location: Louisville, Kentucky, United States
Project Type: Wastewater Treatment Facility
Contract Amount: $64,000,000 USD
Delivery Method: Design - Build
Project Size: N/A
Start Date: May 2000
Completion Date: April 2003
Architect/Engineer: Black & Veatch
Participating Alberici Enterprises
Services Performed
Markets Served
Louisville MSD Alternative Solids Project-Morris Forman Wastewater Treatment Facility
Construction of this project eliminated a major odor source for Louisville and saved the plant more than $4 million annually in operation and maintenance costs. Alberici and Black & Veatch worked as one seamless team to restore four anaerobic digesters, and remove and replace existing dewatering and conveyance systems in the main equipment building. Alberici installed five new centrifuges for dewatering blended sludge, removed abandoned incinerators and installed four Andritz rotary dryers. Four new regenerative thermal oxidizers were installed and a silo was enlarged.
The new treatment process produces biosolids which are then dried and used as fertilizer, similar to the Milorganite product produced by the City of Milwaukee.